Renovated villa among the pines on the Montemar hillside, with a pool and the Castelldefels coast below

Houses, chalets and villas · Castelldefels

House renovation in Castelldefels.
From the roof to the pool, one contract.

Full renovations of chalets and villas: roof, façade, windows, heat pump, interiors, pool and garden, with the architect and the licence included. A fixed price line by line, the dates in the contract and a weekly video if you live abroad.

Free visit and a reply within 24 h. We speak English, Spanish, Russian, French, Polish and Ukrainian.

Whole housefrom €690/m²interior with VAT; roof, façade and pool priced per itemThree example budgets ↓

What we renovate

  • Roof
  • Façade
  • Windows
  • Installations
  • Interiors
  • Heat pump and solar
  • Pool
  • Garden

What a house costs

Three houses, three budgets.
Line by line.

Typical budgets for the houses we see in Castelldefels, with VAT. The interior follows the same per-m² tiers as a flat; the outside and the energy are what make a house different.

Can Roca · terraced house

A family refresh

140 m² over two floors, built in 1998. Kitchen, two bathrooms, floors, air conditioning, windows and the terrace.

Interiors
€61,900
Installations
€18,400
Roof
not included
Façade and windows
€9,800
Heat pump and solar
not included
Outside: terraces, pool, garden
€6,300
Architect, permits and safety
€1,900
Total with VAT€98,300

€702/m²12 weeksPrior notice

Bellamar · detached chalet

From summer house to year-round home

190 m², built in 1974, no insulation. New layout, roof, façade, windows, heat pump and solar panels.

Interiors
€96,500
Installations
€31,800
Roof
€23,600
Façade and windows
€41,700
Heat pump and solar
€29,400
Outside: terraces, pool, garden
€11,200
Architect, permits and safety
€15,900
Total with VAT€250,100

€1,316/m²20 weeksMajor works licence

Montemar · villa with pool

Full rehabilitation

280 m² plus pool, built in 1981. Open plan with a steel beam, ventilated façade, pool, retaining wall and garden.

Interiors
€171,000
Installations
€47,500
Roof
€31,400
Façade and windows
€66,800
Heat pump and solar
€38,900
Outside: terraces, pool, garden
€52,600
Architect, permits and safety
€26,300
Total with VAT€434,500

€1,552/m²24 weeksMajor works licence

Coloured on the drawing: includedGrey: not included

Guide budgets with 10% VAT for a main residence (21% otherwise). Your fixed price comes after the visit and the measurements, and it doesn't change during the works.

Ask for the budget for your house

How we plan a house

Fix it in the right order.
Pay for each thing once.

A house works as a system: roof, walls, pipes and rooms depend on each other. This is the order we follow, whether the works take one season or are split over several years.

Roof of a house in Castelldefels half re-laid: insulation boards and membrane on one side, new clay tiles on the other
Step one: the roof. Everything else sits under it.
  1. Roof and water

    Roof, gutters, terraces and the damp at the foot of the walls. First, a dry house.

    If you swap it: a leak after the works means opening a new ceiling and repainting a finished room.

  2. Structure and layout

    Beams, openings and stairs. This is where the architect decides where each room and each pipe goes.

    If you swap it: moving a wall after tiling means breaking new tiles.

  3. Insulation and windows

    Façade, roof insulation and windows close the house before we choose the heating.

    If you swap it: a heat pump chosen before insulating ends up oversized: you pay for power you'll never use.

  4. Installations

    Wiring, plumbing, drains and heating pipes go into walls and floors while they are open.

    If you swap it: replacing an old pipe later means lifting a new floor.

  5. Interiors

    Floors, kitchen, bathrooms, joinery and paint, once the heavy work and its dust are gone.

    If you swap it: finishes laid during the heavy work get knocked by scaffolds and barrows.

  6. Pool first, garden last

    The pool is dug along with the heavy work; planting and irrigation go in at the end.

    If you swap it: a garden planted before the pool works ends up under the digger's tracks.

Not everything this year? We split the works into stages in this same order and leave conduits and pipes ready for the next one, so nothing has to be opened twice.

Summer houses on the hillside

From summer house to year-round home.
Warm in January, cool in August.

Many chalets in Bellamar and Montemar were built in the 1960s and 70s for the holidays: no insulation, single glazing, electric heaters. Now people live in them all year. This is what changes, and in what order.

Energy rating · example

  1. Aafter
  2. B
  3. C
  4. D
  5. Ebefore
  6. F
  7. G
Heating and hot water a year
≈ €2,900≈ €600
Bedroom on a January morning, heating off
12 °C17 °C
Upstairs in August, no air conditioning
31 °C26 °C

The 190 m² Bellamar chalet from the budgets above. Estimates from the energy certificate; we measure each house.

  1. Roof insulation

    Boards under the tiles: the upper floor stops being an oven in August.

    from €145/m²
  2. Façade insulation

    8 cm outside the walls (ETICS): no centimetre lost inside, no cold spots at the slabs.

    from €98/m²
  3. Windows

    Thermal-break aluminium and low-emissivity double glazing; marine grade near the sea.

    from €690 a window
  4. Heat pump and underfloor heating

    One machine heats, cools and makes hot water, sized after the insulation, not before.

    from €16,500
  5. Solar panels

    5 kW on the roof cover most of the heat pump's daytime use; in Catalonia a prior notice is enough.

    from €6,900
  6. Ventilation

    A sealed house needs fresh air: extractors with trickle vents or heat-recovery ventilation, so no condensation.

    from €3,200
Chalet in Castelldefels during a façade renovation: insulated white half with new windows next to the old cracked render under scaffolding
Façade insulation on a 1970s chalet: finished half on the left, original render on the right.
Heat pump outdoor unit beside a white renovated villa, with solar panels on the roof terrace
Heat pump against the wall, solar panels on the roof: heating, cooling and hot water with one machine.

We order the energy certificate before and after the works: grants and tax deductions ask for both, and so does the bank if you finance the renovation.

Castelldefels, from the sea to the Garraf

Each terrain, its own checks.
Before we give you a price.

Houses by the beach, on the plain and on the hillside age in different ways. On the visit we check different things in each, so the budget doesn't change halfway.

123 SEA RAILWAY · C-31 GARRAF

By the sea

La Pineda, Baixador, Lluminetes, Can Bou

  • SaltRailings, fixings and frames in A4 stainless steel and marine-grade aluminium; ordinary galvanised steel rusts within a few winters.
  • Sand and a shallow water tableWe check the waterproofing of basements and the damp rising up the walls.
  • Coastal lawInside the coastal protection strip, the Ley de Costas allows no extra volume or height. We check the plot before drawing an extension.
Renovated house near the beach in La Pineda, Castelldefels, with marine-grade aluminium windows and a stainless steel and glass terrace railing
Marine-grade aluminium windows and an A4 stainless steel railing on a house near the beach.

On the plain

Centre, Can Roca, El Poal, Can Vinader

  • Shared wallsTerraced and semi-detached houses share walls and sometimes roofs: we agree the works with the neighbour before we start.
  • Installations of their timeHouses from the 1970s to the 1990s: wiring without earth, iron pipes at the end of their life and fibre-cement drains.
  • Street and skipSkip, scaffolding and deliveries need a public-road permit and loading hours; we apply for them and let the neighbours know.
Row of terraced houses on a flat street in Castelldefels, one of them under renovation with scaffolding on the façade and a skip in the street
A terraced house under renovation: scaffolding on the façade and a skip with a street permit.

On the hillside

Bellamar, Montemar, Vista Alegre

  • Water coming down the plotRain runs downhill and pushes against retaining walls: we check drainage, weep holes and cracks before touching the garden.
  • RockDigging a pool or a basement here often hits rock: we test the ground first so the price holds.
  • Steep, narrow streetsSmall lorries, a crane permit when needed and deliveries in batches: the logistics are in the budget from day one.
New stone-faced retaining wall with weep holes and a gravel drain on a sloping garden in Bellamar
New retaining wall with drainage and weep holes on a hillside plot.

Permits in Castelldefels

Which permit does your house need?
Tick what you want to do.

House renovations go through one of two procedures at the Town Hall. We prepare and file both; the difference is time and an architect's project.

What do you want to do?

Your answer

Tick the works on the left

We'll tell you which procedure applies, how long it takes and what we prepare.

Enough with

A prior works notice

Comunicación previa: works that don't touch the structure, the façade or the volume of the house. We file it with the description and the budget.

Architect's project
Not needed
Before starting
About 1–2 weeks
We also apply for
Skip and scaffolding permits

You need

A major works licence

Licencia de obra mayor: structure, roof, façade, new pool or extension. Our architect draws up the project; we file it and follow it up at the Town Hall.

Architect's project
Yes, included in the budget
Before starting
Plan on 2–4 months
Meanwhile
We finish the design and order the windows, so no time is lost

Fibre cement: only a company registered in the RERA can remove it, with a work plan approved by the Generalitat. We coordinate it; it adds about two weeks.

Near the beach: inside the coastal protection strip, the Ley de Costas allows no extension in volume or height. We check the plot first.

Send us the list on WhatsApp
Ground floor of a renovated chalet in Castelldefels: two rooms joined into one living and dining space under a new white steel beam
Opening a load-bearing wall: a steel beam, the architect's calculation and a major works licence.

When to start

A calendar for the outside.
The inside, any month.

Mediterranean weather sets the pace: dry months for roofs, mild ones for render, winter for the pool. If you want to swim in June, the call is in winter.

JANFEBMARAPRMAYJUNJULAUGSEPOCTNOVDEC InteriorALL YEAR
  • PoolOct → Apr

    Renovation or a new pool over the winter, filled by June. For a new pool, call us by January: the licence comes first.

  • Roof and terracesApr → Sep

    Dry months: we open the roof and waterproof the terraces before the autumn storms.

  • Façade and renderMar → Jun · Sep → Oct

    Render and insulation need mild days: no frost and no walls at 35 °C.

  • GardenOct → Mar

    Plant in autumn and winter, with the irrigation laid first and the heavy work finished.

Renovated pool at a villa in Castelldefels with light stone coping, glass mosaic, underwater lights and a teak deck among the pines
A pool renovated over the winter: new coping, mosaic and lights, ready for June.
Covered terrace with a white bioclimatic pergola, an outdoor kitchen and a table for eight looking at the pines and the sea
Pergola and outdoor kitchen: built in spring for a summer outside.

Houses to renovate in Castelldefels

Found a house to renovate?
Call us before you sign.

Before you sign the deposit contract (arras), we visit the house for free: with you, or with you on a video call, and send a written report with a renovation range. Negotiating with numbers is easier.

  1. Send us the listingThe link or the address, and when you can visit.
  2. We visit the houseWith you or on a video call if you're abroad: roof, structure, damp, installations, pool and paperwork.
  3. Report in 3 working daysWhat's urgent, what can wait and a price range for each part, before you sign the arras.

Send us the listing on WhatsApp

1970s chalet to renovate in Castelldefels, with faded render, a corrugated fibre-cement porch roof and an empty pool
What we often find: a fibre-cement porch, an empty pool and damp at the foot of the walls.
Example reportChalet in Bellamar, 1972 · 210 m²Visit before the arras · 8 points
  • Fine
    Structure

    Hairline cracks in the render; beams and slabs sound.

    —
  • Plan it
    Roof

    Tiles in place, no insulation underneath.

    €24,000–28,000
  • Before moving in
    Fibre cement

    Porch roof and water tank in asbestos cement.

    €3,200–4,000
  • Before moving in
    Wiring

    1970s board, no earth in the bedrooms.

    €11,000–14,000
  • Plan it
    Damp

    Rising damp on the wall against the slope.

    €3,500–5,000
  • Plan it
    Pool

    Loses about 2 cm a day; tiles from the 1980s.

    €12,000–16,000
  • Fine
    Retaining wall

    Stone wall with no movement; weep holes to clear.

    €600
  • Plan it
    Paperwork

    The closed porch isn't in the Catastro: legalise it or take it down.

    to check
Full renovation, range€165,000–195,000

FinePlan itBefore moving in

Houses we have renovated

Two houses in Castelldefels.
Part by part.

Two real projects, from the structure to the garden. Each project page has the photos.

Mirador · Castelldefels

A house among the pines

Detached house with garden · full renovation with a new pool

Structure
New openings with beams to join the rooms with the garden.
Façade and roof
Ventilated façade, acrylic render and a roof of black clay tiles.
Pool
A completely new pool, built into the layout of the garden.
Interiors
Bespoke kitchen and wardrobes, parquet, underfloor heating and magnetic track lighting.
See the Mirador project

Villa · Castelldefels

An old three-storey house

Avinguda 334 · full renovation

Back to the base
Partitions and floors removed down to the base to plan the house again.
Windows and heating
New windows, new floors and a new heating system.
Bathrooms and furniture
Bathrooms made completely new and furniture built from the project sketches.
Terraces and garden
Glass balustrades, paths, gravel areas and new planting.
See the Villa project

Questions about houses

Before you call.
Short answers.

01Price

How much does it cost to renovate a house in Castelldefels?

The interior follows the same tiers as a flat: from €690/m² with VAT. What moves the figure is the outside: roof, façade, windows, heat pump and pool. A full rehabilitation with all of that usually comes to €1,100–1,600/m²; the three budgets on this page show where the money goes.

What can I do in a house with €40,000?

For example, the roof with insulation and the windows of a 150 m² house, or a kitchen, a bathroom and new wiring. We start with what protects the rest: water, structure and installations.

Renovate, or demolish and build new?

A new house must meet today's planning rules, which sometimes allow less built area or different setbacks than the existing house has. A renovation keeps what was legally built. Our architect checks the plot's planning before you decide.

02Permits and timing

How long does a house take, including the licence?

A major works licence takes 2–4 months, which we use to finish the design and order windows and materials. On site, an interior with windows takes about 12 weeks, and a full rehabilitation with the outside 20–24 weeks. The dates go into the contract.

Who draws up the project and signs it?

An architect or technical architect who works with us draws up the project, signs it and directs the works. Their fees, the municipal tax on the works and the licence fees appear as a separate line in your budget.

Do solar panels or a heat pump need a licence?

In Catalonia, rooftop solar panels for self-consumption need only a prior notice, except on protected buildings. A heat pump is filed the same way; we place the outdoor unit away from bedrooms and the neighbours' windows.

What if the house has asbestos (uralita)?

Porch roofs, water tanks and drainpipes from the 1960s to the 80s are often fibre cement. Only a company registered in the RERA can remove it, with a work plan approved by the Generalitat. We coordinate it and put it in the schedule.

03During the works

Can we live in the house during the works?

Not during a full renovation: there are days without water or power, and the dust gets everywhere. With works in stages, yes: we close off one floor or one wing and you live in the other.

We live abroad. Who opens the house and receives the deliveries?

We keep the keys, receive the materials, look after the pool while we work and send you a video and photos every week. You only travel if you want to.

04After handover

What guarantee covers the roof, the structure and the pool?

Our written guarantee is three years on workmanship and installations. Works with an architect's project are also covered by the Spanish Building Act (LOE): ten years for the structure and three for defects that affect habitability, such as leaks.

Do you look after the house afterwards?

Yes. If you live abroad or only come in summer, we keep a set of keys, check the house after storms and look after maintenance, the garden and the pool.

Quote

Tell us about your house.
A free visit, then a fixed price.

Leave your phone number or email and, if you can, the address or the listing, the size and what you'd like to do. We reply within 24 hours and suggest a date for the visit.

No obligation. We never share your details with third parties.